Fitting plug-in solar yourself or paying an installer in the UK

Post by Thurgood »

Plug-in solar was designed to be fitted by the householder, and the rules reflect that. Ofgem's August 2026 decision removed the need for a competent installer for plug-in devices, so you can buy a compliant kit and fit it yourself. Octopus, for example, sells its kits with mounting included for self installation, at £450 for one panel and £650 for two in October 2026, although stock has been selling out between restocks.

That does not mean an electrician is never needed. This is how to tell.

Fine to do yourself
  • A compliant kit, checked on the ENA device register, plugged into an existing fixed socket
  • Mounting on a railing, wall or the ground with the brackets supplied, following the manufacturer's instructions
  • Registering the device, which you have to do whoever fits it
Get an electrician if
  • your consumer unit has rewireable fuses (the guidance says not to install at all until that is sorted)
  • you are unsure about the state of your wiring
  • you need a socket moved or a new outdoor socket fitted
  • the total panel power is above 960 W
  • you want the kit on a fence, a garage or an outbuilding roof and are not sure it can take the load
Those points come from the Energy Saving Trust's checklist.

What an electrician visit should cover
  • checking that the socket's circuit does not also supply lighting or hardwired appliances
  • confirming the circuit has RCD protection
  • fitting any new socket and advising on the cable route
Prices vary a lot by area, so ask for a fixed price and get two quotes. If the installer supplies the kit as well as fitting it, the job may qualify for 0% VAT until 31 March 2027, while a kit bought from a shop carries 20%.

Building regulations and permission
Building work can fall under building regulations, so check with building control if you are doing more than fixing brackets. Tenants and leaseholders need permission from the landlord or freeholder either way.

After it is fitted, whoever did it
Test the circuit breaker every six months while the panels are generating. Never open up or repair the inverter or panels yourself; report faults to the manufacturer.

Sources: Energy Saving Trust plug-in solar checklist and Octopus press release (October 2026)

Last updated: 19 October 2026.